Huaneng Haimen Power Plant #1 and #2 Unit Chemical, Waste Water, Desulfurization and Denitrification System Online Chemical Instrument Overhaul and Maintenance (Second) Tender Notice

The tender number: HMZB2016-10-002
Tender code: CBL_20161115_188826061
Category: Domestic Tender for Bidding: Huaneng Haimen Power Plant Source of Funding: Other Huaneng Haimen Power Plant #1, #2 Unit Chemistry, Wastewater, Desulfurization, Denitrification System Online Chemical Instrument Overhaul Maintenance Tender Notice Number: HMZB2016-10-002

Huaneng Power International Co., Ltd. Haimen Power Plant (hereinafter referred to as the “Tenderee”) conducted an open tender for the on-line maintenance and repair of chemical instruments, waste water, desulfurization and denitrification systems for Huaneng Haimen Power Plant #1 and #2 units.
1. project name:
1.1 On-line Chemical Instrument Overhaul Maintenance for Chemical, Wastewater, Desulfurization and Denitrification Systems of Huaneng Haimen Power Plant #1 and #2
1.2 Project Overview: Huaneng Haimen Power Plant is located in Hongdong Village, Haimen Town, Chaoyang District, Shantou City, Guangdong Province, with a total designed installed capacity of 6×1000MW and a phase 1 project of 4×1036 MW (two tenders for this tender). #1 and #2 units (including common parts) on-line chemical analysis instrumentation equipment [including: boiler make-up water system, wastewater treatment system, desulfurization system (desulfurization flue gas monitoring CEMS system: sampling pipeline, probe controller, analytical instrument, system anti- Blowing device, instrument control cabinet and other equipment), denitrification system (Denitrification smoke monitoring CEMS system: sampling pipeline, probe controller, analytical instrument, system back blowing device, instrument control cabinet and other equipment), vapor sampling analysis system and coagulation The PH meter, conductivity meter, silicon meter, sodium meter, dissolved oxygen meter, turbidimeter, oil concentration meter, and pollution meter in systems such as a gas leak detection system, a precision treatment system, a generator overheat insulation monitoring system, and a regeneration system Mud interface analyzers and other analytical instruments; analysis instruments for hydrogen supply systems; hydrogen purity analyzers for generators, dissolved oxygen meters, humidity meters, hydrogen leakage monitors, etc. (including instrumentation cables); and sampling lines, sampling last valves, electromagnetics Valves, Water Control Valves, Probe Controllers, Flow Meters, Ion Exchange Columns, Temperature Control Devices, Thermostat Temperature Controllers, Instrument Control Cabinets, Coal Mills CO Measurements Repair and maintenance of equipment and other related equipment, accident repair, prevention of flood control and safety, energy saving and environmental protection.
2. The scope of tender:
2.1 Bidding scope The on-line chemical instrument maintenance and maintenance bidding for the chemical, waste water, desulfurization and denitrification systems of Huaneng Haimen Power Plant #1 and #2 are detailed in the Technical Bidding Specification.
2.2 The duration of the project is planned to be completed by one full year tender, with a contract period of two years. The specific start time shall be based on the notification from the tenderer.
3. Sources of funds:
Self-financing
4. Bidder qualification requirements:
4.1 Registered in the territory of the People's Republic of China and has independent legal personality.
4.2 In good faith, no fraudulent bids, bids and other serious breaches have been made within the last five years.
4.3 The company shall abide by national laws and administrative regulations, have a good reputation, have the ability to perform the contract and have a record of good performance of the contract. No contract disputes or litigation records, and no major or higher quality and safety accidents occurred in other similar service projects.
4.4 There are no bad records of countries, industries, China Huaneng Group Corporation and its subsidiaries.
4.5 The applicant shall meet the requirements of the tender documents for the applicant and shall not be deemed as an unqualified applicant with corruption, fraud, etc. as defined by the Chinese national laws and regulations and the relevant administrative department.
4.6 have a good bank credit and business reputation, not in the property was taken over, frozen, bankruptcy, is not in the period of the relevant administrative punishment prohibiting tender;
4.7 Bidders cannot participate in bids as subcontractors of other bidders. The person in charge of the unit is the same person or a different unit that has a controlling or managing relationship, and may not participate in the bid for the same tender item or for the same tender item that is not divided into bid sections.
4.8 The bidder must also meet the following requirements:
(1) The bidding unit's registered capital is 2 million yuan and above;
(2) The Bidder shall have the bidder's qualifications related to the maintenance of chemical instrumentation; obtain the safety qualification license and the safety license scope shall meet the requirements of the contractor business level;
(3) At the same time, it has the special industry operation qualification required for the contract tender project (eg professional personnel, testing instruments, etc.), and the special operating personnel have the certificate issued by the competent authority. The project manager assigned to the project must have more than 5 years experience in the management of chemical online analytical instrument work items for 600MW/1000MW thermal power units.
(4) Machinery, tools and equipment and safety protection facilities and safety equipment that meet the needs of equipment maintenance and maintenance, as well as necessary tests, measurement equipment and instrumentation; and a sound project safety management network and safety supervision network.
(5) The bidder shall have the bidder's experience and results of at least three independent performance inspections of the chemical instrumentation, desulphurization and denitrification CEMS system maintenance and repair project for 600 MW and above thermal power generators for at least three years. And the performance evaluation certificate with the official seal of the Owner); the power plant chemical instrument inspection and maintenance unit with the power plant operating background and mature experience can independently complete the maintenance and overhaul of this bid.
(6) The successful bidder project manager, technical maintenance personnel, etc., shall provide the relevant personnel's professional experience and qualifications certification materials, and the above personnel shall not be arbitrarily changed after winning the bid. Maintenance work is strictly prohibited from subcontracting or subcontracting. Project managers and technicians are required to provide proof of social security payment for the past year.
(7) Within 15 working days after receiving the pre-bid notice, the pre-bid unit shall have the project manager and key personnel in place. And half a month before entering the factory safety education and training and handling work transfer and other work matters.
(8) This bid does not accept bids from the Consortium
4.9 Bidders may not be used to obtain qualifications, qualification certificates, etc. by way of transfer or rental, etc. Do not accept the use of forged or altered licenses, provide false financial status or performance, provide false project leader or key technicians' resumes, proof of labor relations, provide false credit status, and other fraudulent behaviors.
* Bidders who do not have the above qualification requirements will not be able to pass the qualification examination and will eventually result in rejected bids.
5. Registration and bidding documents:
(.)

5.3 When purchasing the bidding documents, the contact person filled in on the purchase page must be the business contact person for this bid. All SMS notifications during registration, bidding, bidding, and bid evaluation will be sent to this contact person. All clarifications are also made. Will notify this contact.
5.4 Invite bidders may upload their application documents (including the registration form, 1), and the legal person's business (from the validity period) from 09:00 on November 15, 2016 to 16:00 on November 19, 2016. ) License scans, 3, Legal representatives authorized power of attorney scans, 4, authorized agent ID scans, 5, project manager qualification certification materials, 6, performance contract scans (including cover, scope of supply, signature page )); After the tenderer has passed preliminary examination, the bidder can download the bidding documents.

Contact: Zhang Jie

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

Lithium Ion Battery For Solar System

The Lithium Iron Phosphate (LFP) product type accounted for over USD 12.0 billion in 2020. These batteries offer a long life span and excellent safety to the product. Growing demand for LFP batteries in stationary and portable devices, as they need high load currents and durability, is expected to drive the market for lithium-ion batteries.

Lithium Cobalt Oxide (LCO) was the prominent segment and accounted for 32.3% of the global revenue share in 2020. Growing adoption of Lithium Nickel Manganese Cobalt (NMC) in electric bikes, power tools, and other electric powering trains on account of their lower cost, longer cycle life, and higher energy density will fuel its demand over the projected period. This battery offers overall performance, excels on detailed energy, and holds high capacity and power. The segment is expected to witness a CAGR of 16.2% from 2020 to 2028 in the market for lithium-ion batteries.

A wide range of research and development for the expansion of products that are of high-quality as well as cost-effective was another initiative undertaken by the producers. Supportive government regulations, coupled with subsidiaries and incentives to EVs, have driven their sales across countries. The high stability of such batteries at high temperatures has also amplified their demand across the segment. The LMO segment accounted for a significant revenue share in 2020 and is expected to witness a growth rate of 19.3% from 2020 to 2028 in the market for lithium-ion batteries.

Solar System Batteries,Solar Panel Battery Cost,Enphase Battery Cost,Solar Battery Storage Price

Shenzhen Sunbeam New Energy Co., Ltd , https://www.sunbeambattery.com

This entry was posted in on